Rotational power-cuts

Port Blair
12 May 2017

Due to sudden emergency maintenance work, the 10 MW Hiring Power Plant will remain shut down from 8.30 am to 11.30 am on 14.5.2017. To cope up with the situation, a rotational load shedding for 45 minutes will be carried out at Port Blair and South Andaman areas on 14.5.2017 from 8.30 am to 11.30 am. The timing mentioned above is tentative and may vary subject to availability of power. All are requested to cooperate with the Electricity Department.